KRISHNAMURTHY KONDA - Professional Summary:     

 

 

KRISHNAMURTHY KONDA - Professional Experience:    

 

KRISHNAMURTHY KONDA - Education:   



K.R.KRISHNAMURTHI

E-Mail: krkmkvkb@yahoo.co.uk

Mobile: +919840034806 / +914424724339 / +96892606203

 

Seeking senior managerial assignments in Project Management / Plant Operations/ Erection & Commissioning / Maintenance Operations with an organization of high repute.

 

Professional Synopsis

 A dynamic professional with over 3 decades of rich cross cultural experience in Project Management, Erection & Commissioning, Operations & Maintenance and General Administration.

 Proficiency in managing erection & commissioning of various equipments and maintenance of the same for reducing downtime & enhancing operational effectiveness of equipment.

 Deft in managing maintenance operations involving resource planning, In-process Inspection, Team Building, Development and Co-Ordination with Internal Departments.

 Holds the distinction of implementing quality systems and various techniques for improving the plant operations along with Energy Conservation for cost savings.

 Excellent communication & interpersonal skills with strong analytical, team building, problem solving and organizational abilities.

 

Education

 Diploma in Mechanical Engineering from Tamil Nadu Polytechnic, Madurai, under Board of Technical Education Madras in 1978.

 

Areas of Expertise

 

Erection & Commissioning

 Anchoring on-site erection & commissioning activities for various equipments.

 Ensuring completion of project within the time & cost parameters and effective resource utilization to maximize the output.

 Installation and commissioning as well as conducting tests & inspections to ensure operational effectiveness of plant & utilities.

 Reviewing engineering drawings, technical specifications, cost estimates for Installation & commission of equipment; reviewing & analyzing contractor's change order proposals & submittals.

 

 

 

Man Management

 Directing, leading and motivating workforce; imparting continuous on job training for accomplishing greater operational effectiveness/ efficiency.

 Working on succession planning of the workforce, shift management activities, appraising the member’s performance & providing feedback.

 Resolving interpersonal issues & working towards a harmonious work environment.

 Allocating Technicians, Mechanics and trainees to their jobs based on high priority jobs basis.

 Training of Technicians and Engineers in various trade and certifications.

 

Employment Details

M/s. AL TURKI ENTERPRISES LLC., .MUSCAT.OMAN.

Since FEB.10 To Till Date PROJECT CONTROLLER.

 

Role:

Projects: Petroleum Development of Oman (PDO), site at Marmul

 

 Liasoning with PDO to carry out lump sum projects of flow pipe lines in Marmul, eastren part of Oman

Up to connection to the well heads

 Interaction with clients, PDO with technical guidance, design consultant, site PDO personnel and also interacting with various departments like material procurement, QA/QC, Planning, QS and site personnel for execution of work

 

M/s. ENERGO ENGINEERINGS PROJECTS LTD. NEW DELHI INDIA.

Since Oct 08 - Jan10. Deputy General Manager – Projects.

 

Role:

 Site: Lanco Anpara Thermal Power Project-Anpara-C (2 X 600MW).Utter Pradesh. India

 

 Liaising with Lanco Anpara Thermal Power Project Ltd to carry out the complete coal handling systems

 

 4000 tons of Steel Fab & Erection of Conveyor Galleries,Trestles,Conveyor Structures,

Take-up-towers, Junction and Transfer Houses, Crusher houses, Columns, tie-beams, Trusses,

Trench pent houses and its allied structures etc.

 1500 tons of equipment erections of Truck Trippers, Railway weight bridges, Apron feeders, Chutes for various Transfer Towers, Railway weight bridges, weight scales, Take-up-pullies, bend pullies, Drive Pullies, Motors, Gear boxes, various type of Fluid coupling and couplings, Primary and secondary crushers and screens, various type of gates, Stacker Reclaimers, Chutes and Bunkers, water pipe lines and sprinklers and pumps up to commissioning and handover to the client.

 Looking after the execution of the project starting to commission also handing over to the client. Site billing, budgeting of site expenses, payment to the contractors etc

 Interaction with Clients with Technical Guidance, Statutory Authorities, Labor Problems.

 

AI-SUWAIDI INDUSTRIAL SERVICES CO.LTD, Jubail, Kingdom of Saudi Arabia

 

Since Sep’07 – Sep’08 Mechanical Superintendent-Projects/Construction

 

 Projects handled:

- Effluent Treatment Plant in Saudi Kayan.Jubail.

- Waste Water Treatment Plant in ARAMCO in Dhahran

Role:

 Managing activities pertaining to procurement of project items as per ARAMCO Procedure; interacting with other agencies for procurements, with site erection & commissioning activities; Aramco and their representatives; preparing projects execution plan, various schedules required for ARAMCO standard.

 Managing activities and governing the construction activities of Saudi Kayan Projects as a department representative and submit report to the management.

M/s. TECPRO SYSTEMS LTD., CHENNAI

 

Aug’05-Sep’07 Construction Manager-Projects Execution

Site: Bhushan Steel & Strips Ltd, Meeramandali, Orissa

 

Role:

 Liaising with Bhushan Steel & Strips Ltd, Merramandali, Orissa to carryout the material handling systems of RMHS, DRI & SMS-I

 14000 tons of Steel Fab & Erection Conveyor Galleries,Trestles,Conveyor Structures,

Take-up-towers, Junction and Transfer Houses, Crusher houses, Columns, tie-beams, Trusses,

Trench pent houses and its allied structures of 12 Km of conveyors etc.

 3000 tons of equipment erections of Truck trippers, Wagon Trippers. Apron feeders, various types of drive pullies, take up pullies, Tail pullies, Idlers, various types of couplings, chutes Coal and ore Crushers, Safety switches and other rotary equipments upto commissioning and handover to the client.

 Looking after the execution of the project starting to commission also handing over to the client, included of site billings, site budgeting, payment to contractors and other problems

 Interaction with Clients with Technical Guidance, Statutory Authorities, Labor Problems.

 

KRISHNA ENGINEERING SERVICES

 

Jul’00-Aug’05 Chief Executive

 

Role:

 Accountable for business development activities for Eclipse Combustion USA&UK- Burners and Combustion Systems.

 

Highlights

 Green Tweed & Co: Wear Resistance Materials, Special Type Ö Rings, Gland Packings & Maintenance of Rotary equipments.

 Elaster Group: Gas Flow Meters and its Control Systems

 

 

 

FLS-FULLER BULK HANDLING (I) LTD. Chennai

 

MM’98-Jun’00 Executive-Construction

Site: Pneumatic Handling Systems & Railway Wagon Car Hauling Systems in National Aluminum Company at Damanjodi.Orissa.

 

Role:

 Managing the construction activities and executing the project from starting stage to commissioning and handing over the client.

 Handling finalization of the sub-contracts & budgets for the site works.

 

Consolidated Contractors International Company (S.A.L) LNG Plant in Raslaffan – Doha Qatar

Mar’95-May’96 Foreman

 

 Responsible for erection of Steel Structures of the Gas Train Pipe Racks from the LNG receiving side to Flair.

 Materials receiving from the client and inspection as per the drawings; arranging to send the pipe materials to Painting Contractors & Pipe bending contractors also issue the materials as per the isometric drawings to fab shop and site.

 Co-ordinating with Transport Contractors, Lifting equipments, Cranes, Trailers, Trucks, Forklifts, etc.

 Handling the labors, Riggers, Operators, for the vehicles, store keepers, material co-coordinators, etc. MARSHALL SONS & CO, INDIA LTD., CHENNAI

 

Mar’87-Mar’94 Construction Engineer

 

Performed as Resident Engineer and Handled various Projects like

- Mill Rejects Handling Systems-I and II in Mettur Thermal Power Projects in METTURDAM

- Ore Crushing & Screening Plant for Tamil Nadu Mangensite Ltd., Salem

- Cross Country Conveyor Systems-Stage-II in Talcher Thermal Power Station.Orissa

Previous Assignments

 

DEFIL INDUSTRIES, ABU DHABI, U.A.E

 

Sep’84-Aug’86 Foreman for Oil Field Maintance works

 

MECHANO-FABRICA, BOMBAY

 

Jul’82-Sep’84 Engineer

Sites: Hindustan Lever Ltd – Bombay.

 

INDUSTRIAL AGENCIES CORPORATION, NEW BOMBAY

 

Dec’81-Jul’82 Production In-charge

 

ESWARAN SONS & CO (I) LTD., CHENNAI

 

Aug’80-Aug'81 Fabrication Supervisor in Pressure Vessels

 

SWAASTIC COMPANY. CO, CHENNAI

May’78-Aug’80 Supervisor for Fab Shop

 Fabrication of Pressure Vessels, as per code requirements

 Erection of the equipments and Steel Structures, Tankages, Boiler ancillary equipments, etc.

 Maintenance and repairing of Heat Exchangers, Vessels and Oil Field Equipments etc.

 Looking after the Procedure Test and Performance Test of the Welders and NDT methods etc.

 

Personal Details

Postal Address : 19/10, Vinayagar Apartments,

2nd Street, Andavar Nagar, Kodambakkam, Chennai-600024.

Passport Details : E0152563

DOB : 21/06/1958.

 

Salary Details

 

Salary Expected : Negotiable.

 

 

Candidate Signature:

 

 

 

 

KRISHNAMURTHY KONDA - Interests:     [ Not Updated Yet

 

 

Take your personal and business promotion to the next level - use LookupPage to enhance your Google CV.

 

KRISHNAMURTHY KONDA Links

Contact Information
Not available
LookupPage Directory
   
  Search other Lookup Pages like
KRISHNAMURTHY KONDA
 
LookupPage | Enhanced Online Visibility